← Gesamte Rechtsvorschrift

Art. 6 ·

EU-Recht · · Quelle: EUR-Lex · In Kraft

In EUR-Lex öffnen
Schriftgröße: 100 %

Article 6

This Decision is addressed to the Federal Republic of Germany.

Done at Brussels, 28 October 1998.

For the Commission

Karel VAN MIERT

Member of the Commission

(1) OJ C 119, 17.4.1997, p. 4.

(2) For final terms, see point IV.6.

(3) This guarantee was later extended several times, see point IV.6.

(4) OJ C 368, 23.12.1994, p. 12.

(5) OJ L 219, 4.8.1992, p. 54 and the preceding "Proposal for a Council Directive providing for changes to the seventh Council Directive on aid to shipbuilding of 21 December 1990" (OJ C 155, 20.6.1992, p. 20.).

(6) OJ L 380, 31.12.1990, p. 27.

(7) The financing institution in question was the venture capital wing of Vereins- und Westbank, a private German bank. The BvS acted in this agreement as a private investor would have done in a similar situation, as it gave up certain rights under the previous privatisation agreement with Bremer Vulkan in return for a share in the proceeds from the sale of the holding of Vulkan Industrie Holding in NIR.

(8) See the Commission Decision of 23 July 1998 on State aid C 7/96 (not yet published). NIR terminated its participation in the cash concentration system by a separate agreement between Bremer Vulkan, NIR and the relevant commercial bank. In the agreement, NIR claims on Vulkan Industrie Holding were set off against Neptun Techno Products liabilities to Vulkan Industrie Holding, so that both companies left the cash concentration system with balanced accounts.

(9) Parts of this text have been edited to ensure that confidential information is not disclosed; those parts are enclosed in square brackets and marked with an asterisk.

(10) See point 6 items 1 to 3.

(11) See Article 7 of Directive 90/684/EEC, which stipulates a 10-year closure period.

(12) See Section II.

(13) See the detailed description in point IV.6.

(14) OJ C 368, 23.12.1994, p. 12.

(15) OJ L 194, 6.8.1996, p. 25.

(16) Fortschreitung der Unternehmenskonzeption "Neptun 2000": this restructuring plan handed over to the Commission at a meeting on 30 June 1997 in Brussels contains the essential elements of the final restructuring plan. It is the first restructuring plan which can be considered feasible within the meaning of the guidelines.

(17) The final business plan dates from 12 November 1997 and was sent to the Commission by Germany by letter dated 8 December 1997.

(18) The guarantees in question are shortfall guarantees. The guarantor has to meet the shortfall after liquidation of all collateral securities. The collateral securities provided are mortgages on all real properties belonging to NIR. In its analysis, the Commission estimated the default risk on the basis of the value of the collateral securities, based on assessment of the value of the property. It came to the conclusion that the collateral securities, which had a book value of some DEM 144 million at the end of 1995, would not have been sufficient to repay all loans (some DEM 115 million) from the proceeds of a forced sale of the property. A shortfall in the range of 30 % could have been expected in the two-year guarantee period. This 30 % shortfall on the amount of the guarantees corresponds to an amount of DEM 21,3 million.

(19) As mentioned in the guidelines, the Commission will consider favourably an extension of the rescue aid until its investigation is completed.

(20) See point IV.8.