Article 2
The Specialised Committee recommends that each Party request that its respective TSOs for electricity and, for the Union, the European Network of Transmission System Operators for Electricity (‘ENTSO-E’) facilitating the work of EU TSOs jointly commence an initial concept-validation phase prior to producing the single set of initial draft technical procedures for MRLVC in accordance with Annex 29 to the Trade and Cooperation Agreement and with supporting analysis, comprising:
(a)
an optimal operational timeline combining the operations of the MRLVC, the EU Single Day-Ahead Coupling and the Great Britain wholesale electricity market arrangements under a Common Order Book approach, including the optimal validation and fallback arrangements. The optimal operational timeline should promote the robust and efficient use of interconnectors while minimising risks for the secure operation of the EU and UK electricity wholesale markets and taking into account possible market developments up to 2030-35. The operational risks linked to that timeline on both the EU Single Day-Ahead Coupling and the Great Britain wholesale electricity market should be assessed and, to the extent possible, quantified. A range of options for operational timelines should be included in the supporting analysis to support the identification and assessment of the validity of an optimal timeline;
(b)
a draft tender specification for a prototype for a bordering bidding zone net position forecaster which should:
(i)
include a detailed description of requirements, including:
—
the methodology (e.g., statistical and/or deterministic) to be employed;
—
specific outputs that would be required from the forecaster;
—
how the forecaster will incorporate future market developments, including the future introduction of new bidding zones whether onshore or offshore;
—
how outputs from the forecaster will be inputted into wider MRLVC processes;
—
any other key requirements identified through the work set out under point (a) of this Article and Article 3;
(ii)
be accompanied by:
—
information on how the tender would be issued and governed, including consideration of ownership and intellectual property rights;
—
a detailed breakdown of anticipated timings and costs;
—
any relevant issue related to administrative functions required to address EU and UK system interdependencies in the implementation of an MRLVC solution.