← Gesamte Rechtsvorschrift

Art. document-2:3 ·

EU-Recht · · Quelle: EUR-Lex · In Kraft

In EUR-Lex öffnen
Schriftgröße: 100 %

Article 3

1.   The Specialised Committee recommends that the Parties request that their respective TSOs for electricity and, for the Union, the ENTSO-E facilitating the work of EU TSOs produce a joint report for the Specialised Committee investigating any barriers to the delivery of joint and hybrid offshore projects that may result from existing trading arrangements or MRLVC, and any specific changes needed to existing trading arrangements or specific requirements of the design of MRLVC needed to deliver efficient electricity trading that supports the delivery of joint and hybrid offshore projects.

2.   The TSOs joint report should:

(a)

investigate the impact of both existing trading arrangements and an MRLVC solution on joint and hybrid projects, over the medium term (2030-2035 horizon), with a particular focus on:

(i)

the scope of the application of the trading arrangements, and whether and how the performance of capacity allocation may be affected;

(ii)

how these trading arrangements could operate with different market designs, in particular offshore bidding zones; and

(iii)

whether there may be sufficient clarity in the business case for infrastructure investment;

(b)

take into consideration:

(i)

the nature and scale of possible offshore renewable energy infrastructure developments across the North Seas in the medium term, including possible hybrid interconnectors, energy islands, meshed grids and offshore electrolysers;

(ii)

possible mechanisms of price formation;

(iii)

the complementary role of forward and intraday trading arrangements;

(iv)

the impact on the accuracy of bordering bidding zone forecasts; and

(v)

any specific adjustments that may be required in the design features of these trading arrangements, within their general confines, to help address any identified barriers and/or requirements in the development and operation of joint and hybrid offshore projects to deliver efficient trading arrangements.