Schriftgröße: 100 %
Article 2
1. In the first phase, the Commission shall draw up the specifications for the new Animo system, analyse the system and present a prototype.
The Commission shall have a budget of EUR 200000 for that work.
2. In the second phase, the Commission shall develop the new Animo system and make the database available to the Member States.
3. The Commission shall also develop and integrate into the new computer system the Shift system, in particular the functions required to aid decision-making at border inspection posts, as regards both regulatory matters and risk analyses.
