Schriftgröße: 100 %
Article 3
1. All the costs relating to the actions and measures referred to in Article 2 (a), (c) and (e) shall be borne by the general budget of the European Communities.
2. The level of funding for the actions and measures referred to in Article 2 (b), (d) and (f) shall be set at a maximum of 50 % of their total cost.
3. The balance of the funding of the actions and measures referred to in Article 2 (b), (d) and (f) may be made up from either public or private sources or from a combination of the two.
