Schriftgröße: 100 %
Article 1
1. The stage of a preparatory study on the extension of the multipurpose terminal in the port of Sines in Portugal as described in Annex I hereto is hereby approved for the period from 1 January to 30 June 1994.
2. References to 'project' in the following Articles and Annexes shall be understood to mean also 'preparatory study'.
