← Gesamte Rechtsvorschrift

Art. 6 · 94/685/EC: Commission Decision of 28 March 1994 concerning the grant of assistance from the cohesion financial instrument to the stage of project concerning the work to increase the volume of water that can be supplied from the Evinos to Athens (Evinos aqueduct): second stage in Greece No CF: 93/09/61/074 (Only the Greek text is authentic)

EU-Recht · · Quelle: EUR-Lex · In Kraft

In EUR-Lex öffnen
Schriftgröße: 100 %

Article 6

Community assistance is subject to observance of the following requirements:

- any income accruing directly from the project shall be declared to the Commission,

- a full hydrological study of the Evinos karst system and a study of how best to integrate management of the area's water resources for the supply of Athens in particular shall be commissioned and completed and the findings taken into consideration in execution of the present project,

- the leaks in the Mornos reservoir and in the conduits leading to Athens shall be located and a proposal for action to deal with them drawn up,

- a regulation reservoir downstream from the Evinos reservoir to ensure a minimum throughput of 1 m³/sec throughout the year, particularly in summer, shall be built,

- water quality in the Evinos reservoir shall be systematically monitored, as is done for the Mornos reservoir.