Article 4
1. Sampling for laboratory analysis as referred to in the third indent of the second subparagraph of Article 6 (1) of Directive 91/493/EEC is intended to confirm that the own-checks system complies effectively with Articles 1, 2 and 3 of this Decision.
2. The persons responsible for the establishment must make provision for a sampling programme which, though not concerning systematically every production batch, nevertheless allows:
(a) validation of the own-checks system when first set up;
(b) if necessary, revalidation of the system in case of a change to the characteristics of the product or to the manufacturing process;
(c) verification, at specified intervals, that all provisions are still appropriate and properly applied.
3. Own-checks system shall be confirmed in accordance with the provisions set out in Chapter III of the Annex.
