Article 2
1. The light-section and medium-section mills in Seixal shall be definitively closed down. This represents a total capacity close-down of 140 000 tonnages per year, so that the maximum production capacity in long products will be limited to 740 000 tonnes per year (380 000 tonnes per year in Seixal and 360 000 tonnes per year in Maia).
2. The blast furnace of the Seixal plant for long products shall be closed down and replaced by an electric arc furnace DC-EAF 140t.
3. The capacity closures must be achieved in accordance with the timetable laid down in the restructuring plan, i.e. at the latest by the end of 1995.
4. The finality of the closures referred to in paragraphs 1 and 2 shall be ensured either by the demolition of the installations concerned or by their disposal by sale outside Europe.
5. The beneficiary company shall not increase its remaining capacity for crude steel and hot-rolled finished products under the restructuring plan, other than resulting from productivity improvements, for a period of at least five year starting from the date of the last capacity closure under the plan or the date of the last payment of aid, in respect of investments under the plan, whichever is the later.
6. As long as the capacity limitation referred to in paragraph 5 exists, the liquid steel production of the company (including the new electric are furnace referred to in paragraph 2) shall not exceed the requirements of the company's hot-rolling production capacity.