Article 4
The following provisions of the contract of 4 May 1971 between CRAM and PYA constitute an infringement of Article 85 of the Treaty:
1. Undertaking by PYA to refrain from manufacturing rolled zinc products (Article I.14).
2. Undertaking by CRAM not to increase its production capacity in the field of zinc alloys as long as that of PYA does not exceed 15 000 tonnes per year, and to reduce, if necessary, its own production by having up to 5 000 tonnes per year produced on its behalf by PYA (Article II.6 and 8).
3. Mutual undertaking by CRAM and PYA to cooperate with a view to creating new alloy production capacity once PYA's production has reached 15 000 tonnes per year (Article II.7).
4. Undertaking by PYA to procure rolled products only from CRAM in respect of part (sale in France) of its requirements (Article I.2), to grant it preferential treatment on equal terms in respect of the remainder (Article I.10), and to 'comply with the rules of fair competition' when selling rolled products acquired from third parties in the event of CRAM's being unable to supply (Article I.13); prohibition on CRAM exporting rolled products to Greece and Italy (Article I.10) and on PYA importing rolled products save where CRAM is unable to supply (Article I.14).
5. Undertaking by CRAM to grant preferential treatment to PYA in respect of all supplies of alloys.
