Weitere Informationen und Metadaten
Konsolidierte Fassung vom 13.07.2026 · CELEX: 02025D2377-20260713
Rechtsstatus des zugrunde liegenden Rechtsakts laut EUR-Lex: In Kraft.
Gültig ab: 24.11.2025
Metadatenstand: 30.10.2026
02025D2377 — EN — 13.07.2026 — 001.001
This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions of the relevant acts, including their preambles, are those published in the Official Journal of the European Union and available in EUR-Lex. Those official texts are directly accessible through the links embedded in this document
|
►B |
COUNCIL DECISION (CFSP) 2025/2377 of 24 November 2025 on an assistance measure under the European Peace Facility to support the Armed Forces of the Democratic Republic of the Congo (OJ L 2377 25.11.2025, p. 1) |
Amended by:
|
|
|
Official Journal | ||
|
No |
page |
date | ||
|
►M1 |
COUNCIL DECISION (CFSP) 2026/1719 of 13 July 2026 |
L 1719 |
1 |
14.7.2026 |
▼B
COUNCIL DECISION (CFSP) 2025/2377
of 24 November 2025
on an assistance measure under the European Peace Facility to support the Armed Forces of the Democratic Republic of the Congo
Article 1
Establishment, objectives, scope and duration
The objectives of the assistance measure are the following:
to strengthen the cooperation between the Union and the Democratic Republic of the Congo in the area of security and defence;
to strengthen overall military and defence capacities of the Armed Forces of the Democratic Republic of the Congo;
to support the Armed Forces of the Democratic Republic of the Congo in their efforts to contain the expansion of the threat on the national territory, and to protect the sovereignty of the country and its civilian population.
To achieve the objectives set out in paragraph 2, the assistance measure shall finance the following types of equipment not designed to deliver lethal force:
medical support equipment;
radio equipment;
engineering equipment;
light boats.
The assistance measure shall also finance related supplies and services, including technical training, where needed.
Article 2
Financial arrangements
Article 3
Arrangements with the beneficiary
The arrangements referred to in paragraph 1 shall include provisions obliging the beneficiary to ensure:
compliance of the units supported under the assistance measure with relevant international law, in particular international human rights law and international humanitarian law;
proper and efficient use of any assets provided under the assistance measure for the purposes for which they were provided;
sufficient maintenance of any assets provided under the assistance measure to ensure their usability and operational availability over their life cycle;
that any assets provided under the assistance measure are not lost or transferred to persons or entities other than those identified in those arrangements.
Article 4
Implementation
▼M1
▼B
Article 5
Monitoring, control and evaluation
The post-shipment control of equipment and supplies shall be organised as follows:
delivery verification, whereby EPF delivery certificates are to be signed by the end-user forces upon transfer of ownership;
reporting on the inventory, whereby the beneficiary is to report annually on the inventory of designated items until such reporting is no longer deemed necessary by the Political and Security Committee (PSC);
on-site visits, whereby the beneficiary is to grant the High Representative and the EPF auditors access to conduct on-site checks and EPF audits, upon request.
Article 6
Reporting
During the period of implementation, the High Representative shall provide the PSC with six-monthly reports on the implementation of the assistance measure, in accordance with Article 63 of Decision (CFSP) 2021/509. The administrator for assistance measures shall regularly inform the Facility Committee established by Decision (CFSP) 2021/509 on the implementation of revenue and expenditure in accordance with Article 38 of that Decision, including by providing information on the suppliers and subcontractors involved.
Article 7
Suspension and termination
Article 8
Entry into force
This Decision shall enter into force on the date of its adoption.
