← Alle Rechtstexte

Commission Implementing Decision of 4 December 2013 confirming the acceptance of an undertaking offered in connection with the anti-dumping and anti-subsidy proceedings concerning imports of crystalline silicon photovoltaic modules and key components (i.e. cells) originating in or consigned from the People's Republic of China for the period of application of definitive measures (2013/707/EU)

EU-Recht · · Quelle: EUR-Lex · Nicht mehr in Kraft

In EUR-Lex öffnen
Schriftgröße: 100 %
Weitere Informationen und Metadaten

Konsolidierte Fassung vom 01.10.2017 · CELEX: 02013D0707-20171001

Rechtsstatus des zugrunde liegenden Rechtsakts laut EUR-Lex: Nicht mehr in Kraft.

Gültig ab: 06.12.2013

Gültig bis: 30.09.2017

Metadatenstand: 22.10.2026

02013D0707 — EN — 01.10.2017 — 002.001

This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions of the relevant acts, including their preambles, are those published in the Official Journal of the European Union and available in EUR-Lex. Those official texts are directly accessible through the links embedded in this document

►B

COMMISSION IMPLEMENTING DECISION

of 4 December 2013

confirming the acceptance of an undertaking offered in connection with the anti-dumping and anti-subsidy proceedings concerning imports of crystalline silicon photovoltaic modules and key components (i.e. cells) originating in or consigned from the People's Republic of China for the period of application of definitive measures

(2013/707/EU)

(OJ L 325, 5.12.2013, p.214)

repealed by:

 

 

Official Journal

No

page

date

 

Commission Implementing Regulation (EU) 2017/1570 of 15 September 2017

L 238

22

16.9.2017