Weitere Informationen und Metadaten
Veröffentlichte Fassung · 31996D0537 · CELEX: 31996D0537
Rechtsstatus des zugrunde liegenden Rechtsakts laut EUR-Lex: Nicht mehr in Kraft.
Gültig ab: 31.07.1996
Gültig bis: 13.07.1997
Metadatenstand: 22.10.2026
COMMISSION DECISION of 30 July 1996 defining the specifications of projects of common interest identified by Decision No 1254/96/EC of the European Parliament and of the Council laying down a series of guidelines for trans-European energy networks (Text with EEA relevance) (96/537/EC)
THE COMMISSION OF THE EUROPEAN COMMUNITIES,
Having regard to the Treaty establishing the European Community,
Having regard to Decision No 1254/96/EC of the European Parliament and of the Council of 5 June 1996 laying down a series of guidelines for trans-European energy networks (1), and in particular Article 6 (4) thereof,
Whereas the projects of common interest identified by Decision No 1254/96/EC should be specified by indicating their location;
Whereas the measures provided for in this Decision are in accordance with the opinion of the Committee established by Article 9 of Decision No 1254/96/EC,
HAS ADOPTED THIS DECISION:
Article 1
The specifications of the projects of common interest identified by Decision No 1254/96/EC are set out in the Annex.
Article 2
This Decision is addressed to the Member States.
Done at Brussels, 30 July 1996.
For the Commission
Christos PAPOUTSIS
Member of the Commission
(1) OJ No L 161, 29. 6. 1996, p. 147.
ANNEX
TRANS-EUROPEAN ENERGY NETWORKS
Specifications of projects of common interest identified by Decision No 1254/96/EC:
Electricity networks
(a) Connection of isolated electricity networks to European interconnected networks
a 1 Island Magee-Coylton
a 4 Ipiros-Puglia
(b) Development of interconnections between Member States
b 1 Bjæverskov-Bentwisch
b 4 Moulaine-Aubange
b 6 Grand île-Piossasco
b 7 Cazaril-Aragon or alternative route/layout
b 9 Aubange-Bertrange
b 10 Aldeadavila-Douro International
Meson-Lindoso
b 12 Lienz-Cordignano
(c) Development of internal connections necessary to make the best use of interconnections between Member States
c 3 Zwolle-Meeden-Eemshaven
c 4 Sierrentz-Mulbach
c 5 15 sub-projects
c 7 Recarei-Douro International
Pego-Rio Maior II
(d) Development of interconnections with third countries in Europe and the Mediterranean region helping to improve the reliability, security and supply of the Community electricity networks
d 5 Gorlago-Robbia
d 9 Thessaloniki-Hamitabat
d 13 Pinar-Melloussa
Gas networks
(e) Introduction of natural gas into new regions
e 5 Setubal-Braga
e 6 Bulgaria-Athens
LNG (1) at Revithoussa
(f) Connection of isolated gas networks to the interconnected European networks, including the necessary improvement of the existing networks, and connection of separate natural gas networks
f 2 Bacton-Zeebrugge
f 6 Leiria-Cordoba
Braga-Tuy-Oviedo
(g) Increasing reception (LNG) (2) and storage capacity necessary to satisfy demand, and diversification of supply sources and routes for natural gas
g 3 LNG of Montoir
g 4 LNG of Montalto di Castro
g 8 Storage at Huete
Storage at Nueva Carteya
g 11 Storage of Loenhout
(h) Increasing transmission capacity (gas delivery pipelines) necessary to meet demand and diversification of supply sources and routes for natural gas
h 12 including the Berneau-Eynatten connection
(1) LNG: liquefied natural gas terminal.
