← Alle Rechtstexte

Council Decision of 17 December 1973 amending the Decision of 21 June 1971 adopting a five-year research and training programme of the European Atomic Energy Community in the field of fusion and plasma physics

EU-Recht · · Quelle: EUR-Lex · Nicht mehr in Kraft

In EUR-Lex öffnen
Schriftgröße: 100 %
Weitere Informationen und Metadaten

Veröffentlichte Fassung · 31974D0036 · CELEX: 31974D0036

Rechtsstatus des zugrunde liegenden Rechtsakts laut EUR-Lex: Nicht mehr in Kraft.

Gültig bis: 31.12.1975

Metadatenstand: 23.11.2026

Seite 1

Original-PDF · Seite 1

No L 30/ 18 Official Journal of the European Communities 4. 2 . 74 COUNCIL DECISION of 17 December 1973 amending the Decision of 21 June 1971 adopting a five-year research and training programme of the European Atomic Energy Community in the field of fusion and plasma physics ( 74/36/Euratom ) LHE COUNCIL OF THE EUROPEAN COMMUNITIES , delay, without prejudice, however, to a final decision to proceed to the construction stage ; Having regard to the Treaty establishing the Whereas the abovementioned developments call for European Atomic Energy Community, and in increased mobility of staff, particular Article 7 thereof; Having regard to the proposal from the Commission HAS DECIDED AS FOLLOWS : submitted after consultation with the Scientific and Technical Committee ; Article 1 Whereas the programme which is the subject of the The programme set out in the Annex to the Council Decision of 21 June 1971 (*) adopting a five­ Decision of 21 June 1971 is replaced by the pro­ gramme annexed to this Decision . year research and training programme of the EAEC in the field of fusion and plasma physics should be adjusted, amended by the Decision of 14 May Article 2 1973 (2 ) to take account of the additions to the operations to be conducted pursuant to this Decision ; Article 2 of the Decision of 21 June 1971 shall be replaced by the following : Whereas the Commission proposal adequately 'The maximum amount of expenditure supplements the third five-year programme as commitments and the staff necessary for the regards the operations to be conducted during 1974 implementation of this programme shall be fixed and 1975 in order to ensure the continuity of this at 71*1 million units of account and 112 programme which, moreover, takes its place in the Community servants plus 20 temporary wider context of the security of the long-term Community servants, the unit of account being energy supplies of the Community ; defined in Article 10 of the Financial Regulation (3 ) of 25 April 1973 applicable to the general budget of the European Communities .' Whereas the results already obtained in the course of the third programme show that it is desirable to undertake detailed studies to serve as a basis for a Done at Brussels, 17 December 1973 . possible subsequent decision on providing the For the Council Community with a large machine of the Tokamak The President type JET ('Joint European Torus'); whereas measures must be taken to avoid any unnecessary I. N0RGAARD (!) OJ No L 143 , 29 . 6. 1971 , p. 33 . ( 2) OJ No L 153, 9 . 6. 1973 , p. 17. ( 8 ) OJ No L 116 , 1 . 5 . 1973 , p. 1 .

Seite 2

Original-PDF · Seite 2

4. 2 . 74 Official Journal of the European Communities No L 30/ 19 ANNEX FUSION AND PLASMA PHYSICS 1 . An amount of 71-1 million units of account shall be allocated to this programme and the upper limit for staff shall be fixed at 112 permanent servants! and 20 temporary servants . This amount is intended to cover: — the expenditure on equipment concerned with operations already undertaken or to be undertaken during the last two years of the programme which are accorded priority status and specified in point 5 ; — the expenditure relating to the design phase of the large Tokamak JET project ; — the cost of staff mobility ; — the other expenditure relating to operations to be carried out under this programme. 2 . The subject-matter of the programme which will be executed by the associated laboratories shall be: — general physics in the sector concerned, in particular studies of a basic character or relating to confinement of plasma with suitable devices and to methods for producing and heating plasma ; — research on the confinement in closed and open-ended configurations of plasma of widely varying density and temperature; — production of and research on plasma of high and very high density ; — improvement of diagnostics methods; — investigation of technological problems connected with current research and of problems relating to thermonuclear reactor technology ; — the design phase of the JET project. This work shall be carried out by means of association contracts. 3 . The programme set out in point 2 shall be part of a long-term cooperative project embracing all work carried out in the Member States in the field of fusion and plasma physics. It is designed to lead in due course to the joint construction of prototypes with a view to their industrial scale production and marketing. 4 . Within the upper limit of 71-1 million units of account; ( a) a maximum amount of 17-8 million units of account shall be allocated to the financing of equipment for the operations specified in point 5 which have been or are to be undertaken, a standard preferential rate of participation not exceeding 44°/o being applied,. In return, all members of the association shall have the right to take part in the experiments carried out with this equipment; (b) a maximum amount of 1-25 million units of account shall be set aside for expenditure for ensuring mobility of research staff of the Member States in order to enable them to work in the associated laboratories or the JET Working Party ; ( c) a maximum amount of 1-6 million units of account shall be set aside for expenditure incurred in the first design phase of the JET project, of which 1 million units of account may be financed at 100 °/o by the Commission for work to be carried out by contracts other than association contracts, and up to 0-6 million units of account may be provided to increase its participation in the work carried out for the JET project in each associated laboratory to about 44 °/o. (d) the amount not set aside for the operations and expenditure referred to in sections ( a), (b) and (c) shall form the upper limit of financial participation by the Community in other expenditure of the Associations, in their management and in support of the JET project. This participation shall be at a standard rate of about 25 %>. By way of derogation from this principle, this rate shall be increased to a maximum of 30 °/o for the Euratom/CNEN-CNR Association, which will further benefit from the assumption by the programme of the expenses in respect of the Euratom staff seconded thereto. 5 . After conducting a technical examination of the various projects, the Commission may finance, within the following upper limits, the operations mentioned below, which are accorded priority status: — low-beta stellarator and tokamak 11-8 million u.a . — screw pinch and high-beta stellarator 3-3 million u.a. — heating and injection processes 1-9 million u.a. — very high density processes 1*4 million u.a. — open-ended configurations 0-5 million u.a. — reactor technology 0-9 million u.a.