Weitere Informationen und Metadaten
Konsolidierte Fassung vom 15.04.2013 · CELEX: 02010D0403-20130415
Rechtsstatus des zugrunde liegenden Rechtsakts laut EUR-Lex: In Kraft.
Gültig ab: 20.07.2010
Metadatenstand: 30.10.2026
02010D0403 — EN — 15.04.2013 — 001.001
This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions of the relevant acts, including their preambles, are those published in the Official Journal of the European Union and available in EUR-Lex. Those official texts are directly accessible through the links embedded in this document
|
►B |
COMMISSION DECISION of 14 July 2010 exempting the production and wholesale of electricity in Italy’s Macro-zone North and the retail of electricity to end customers connected to the medium, high and very high voltage grid in Italy, from the application of Directive 2004/17/EC of the European Parliament and of the Council coordinating the procurement procedures of entities operating in the water, energy, transport and postal services sectors (notified under document C(2010) 4740) (Only the Italian text is authentic) (Text with EEA relevance) (2010/403/EU) (OJ L 186 20.7.2010, p. 44) |
Amended by:
|
|
|
Official Journal | ||
|
No |
page |
date | ||
|
►M1 |
COMMISSION IMPLEMENTING DECISION of 26 September 2012 |
L 271 |
4 |
5.10.2012 |
▼B
COMMISSION DECISION
of 14 July 2010
exempting the production and wholesale of electricity in Italy’s Macro-zone North and the retail of electricity to end customers connected to the medium, high and very high voltage grid in Italy, from the application of Directive 2004/17/EC of the European Parliament and of the Council coordinating the procurement procedures of entities operating in the water, energy, transport and postal services sectors
(notified under document C(2010) 4740)
(Only the Italian text is authentic)
(Text with EEA relevance)
(2010/403/EU)
Article 1
Directive 2004/17/EC shall not apply to contracts awarded by contracting entities and intended to enable the following activities to be carried out:
▼M1
production and wholesale of electricity produced from conventional sources to be carried out in the macro-zone north of Italy;
▼B
retail supply of electricity to end customers connected to the medium, high and very high voltage grid in the entire territory of the Italian Republic.
▼M1
Directive 2004/17/EC shall apply to contracts awarded by contracting entities and intended to enable production and wholesale of electricity produced from renewable sources to be carried out in the macro-zone north of Italy.
▼B
Article 2
This Decision is addressed to the Italian Republic.
( 1 ) OJ L 134, 30.4.2004, p. 1.
( 2 ) This includes the Zone Nord as well as four smaller zones (Ene, Enw, Turbigo and Monfalcone), as referred to in Annex B to Commission Communication of 10 January 2007 ‘Inquiry pursuant to Article 17 of Regulation (EC) No 1/2003 into the European gas and electricity sectors (Final Report)’ (COM(2006) 851 final, ‘Final Report’).
( 3 ) OJ L 27, 30.1.1997, p. 20.
( 4 ) OJ L 176, 15.7.2003, p. 37. It is to be noted that Directive 2003/54/EC has been replaced by Directive 2009/72/EC of the European Parliament and of the Council of 13 July 2009 concerning common rules for the internal market in electricity and repealing Directive 2003/54/EC (OJ L 211, 14.8.2009, p. 55), which requires an even higher degree of market opening than the previous two directives. However, as the deadline for its implementation has not yet expired, reference will continue to be made to the legal framework introduced by Directive 2003/54/EC.
( 5 ) MERGER COMP M - 4110 E.ON – Endesa, p. 3.
( 6 ) See Final Report, Annex B, point A1, 2.
( 7 ) This includes the Zones Centro Nord, Piombino, Centro Sud, Sud, Rossano, Brindisi and Calabria.
( 8 ) This includes the zones Sicilia, Priolo and Calabria.
( 9 ) See Commission Decisions 2009/47/EC (OJ L 19, 23.1.2009, p. 57); 2008/585/EC (OJ L 188, 16.7.2008, p. 28); 2008/741/EC (OJ L 251, 19.9.2008, p. 35); 2007/141/EC (OJ L 62, 1.3.2007, p. 23); 2007/706/EC (OJ L 287, 1.11.2007, p. 18); 2006/211/EC (OJ L 76, 15.3.2006, p. 6) and 2006/422/EC (OJ L 168, 21.6.2006, p. 33).
( 10 ) i.e. the quantity of electricity needed for internal consumption and exports.
( 11 ) Letter 0018212 of 10 May 2010 of the Italian Authority for Electricity and Gas.
( 12 ) Law No 99/2009 of 23 July 2009.
( 13 ) SEC(2010) 251, hereinafter ‘2010 Communication’.
( 14 ) Table 3.1 of the Technical Annex (p. 12) to 2010 Communication.
( 15 ) Annual Report on the State of Services and the Regulatory Activities of Italian Authority for electricity and Gas (AEEG) of 31 March 2009 (hereinafter the ‘2009 Annual Report of AEEG’), p. 76.
( 16 ) It corresponds very closely to the level of concentration, 43 %, found on the Swedish retail market (see recital 14 of Decision 2007/706/EC).
( 17 ) Commission Communication of 15 November 2005 ‘Report on progress in creating the internal gas and electricity market’ (COM(2005) 568 final, hereinafter ‘2005 Communication’), p. 9.
( 18 ) Table 2.2 of Technical Annex to 2010 Communication.
( 19 ) See recital 13 of Decision 2008/585/EC.
( 20 ) 2009 Annual Report of AEEG.
( 21 ) See point 328 of the judgment of the Court of First Instance of 28 February 2002 in Case T-395/94 Atlantic Container Line AB and Others v Commission, [2002] ECR II-875.
( 22 ) In fact, the regulated prices are set on the basis of prices that are found on the free market.
( 23 ) Letter 0032953 of 20 May 2010 of the Italian Competition Authority.
